Voltar para Vagas
H-2A

farmworkers & laborers

McClure Properties LTD (#4)

LocalParrish, FLORIDA
Remuneração$15/Hour
Tipo de VistoH-2A
Início19 de outubro de 2026
Término04 de junho de 2027
Vagas113 trabalhadores

Descrição da Vaga

Os trabalhadores executarão as especificações de trabalho descritas conforme instruído pelo Gerente da Fazenda ou Supervisor da Tripulação. Os deveres podem variar de tempos em tempos e podem incluir uma ou mais das seguintes especificações de trabalho:

Colocar Plástico (Gotejamento): Os trabalhadores são obrigados a carregar de 75 a 80 lbs. rolos de plástico e rolos de fita de gotejamento pesando aproximadamente 50 lbs em máquinas e andar na parte de trás das máquinas para garantir que os rolos sejam distribuídos uniformemente em leitos de sujeira. Workers are required to ride fertilizer wagon and use a shovel to make sure there is no clogging of fertilizer at distribution. Workers are required to remove casing when rolls of plastic and drip tape have emptied and repeat process. Plastic machine riders have other tasks required to lay plastic such as: bed pressing, clean out fertilizer hoppers, painting numbers and measuring row lengths. Workers are required to use a shovel to tuck in the ends of the plastic being laid by machinery at the ends of each row. Repairs are to be made to plastic and splices as necessary throughout field. Units covered will be divided by number of workers on the crew times the pay rate.

Lay Plastic (Seep): Workers are required to load 75 to 80 lbs. rolls of plastic and drip tape rolls weighing approximately 50lbs on to machinery and ride on the back of machinery to ensure rolls are distributed evenly on beds of dirt. Workers are required to ride fertilizer wagon and use a shovel to make sure there is no clogging of fertilizer at distribution. Workers are required to remove casing when rolls of plastic and drip tape have emptied and repeat process. Plastic machine riders have other tasks required to lay plastic such as: bed pressing, clean out fertilizer hoppers, painting numbers and measuring row lengths. Workers are required to use a shovel to tuck in the ends of the plastic being laid by machinery at the ends of each row. Repairs are to be made to plastic and splices as necessary throughout field. Workers are to cut plastic at each hundred-foot marked area to create a walkway by slicing with shovel and tuck plastic after removing excess dirt to create walkways for harvest. Workers are required to dig a spillway at each row designated; by the removal of dirt and forming a plastic barrier with rolls of plastic to create a spillage for water to drain. Units covered will be divided by number of workers on the crew times the pay rate. V DITCHES -End & Row Cutting: Worker is to cut plastic at each hundred-foot marked area to create a walkway by slicing with shovel and tuck plastic after removing excess dirt to create walkways for harvest. Workers are required to dig a spillway at each row designated; by the removal of dirt and forming a plastic barrier with rolls of plastic to create a spillage for water to drain. Units covered will be divided by number of workers on the crew times the pay rate.

Plastic Repair: Repairs are to be made to plastic and splices as necessary throughout field.

Shovel Work (End): Workers are required to use a shovel to tuck in the ends of the plastic being laid by machinery at the ends of each row.

# Número do Processo DOL: H-300-26217-147791·Ver esta vaga no site oficial ↗·Ver Ordem de Trabalho (PDF)